Hanging Sign Information
Hanging Sign Instructions:
1. Start the approval process by submitting the intent to hang a sign line item.
2. Review the Engineering Stamp FAQ
3. Complete and submit the following no later than December 15, 2025:
• Structural Integrity and Hanging Sign Information forms
• Upload all diagrams and assembly instructions online. Diagrams must include the following:
• Hang point locations
• Height above the floor of each point
• Weight that will be suspended from each point
• Exhibit plan showing the location of hanging points and the structure as it pertains to the exhibit plan.
• If any hang point supports over 200lbs., notify PES immediately for approval.
4. Order hanging sign labor no later than January 7, 2026.





